TOGGLE MENU

Beamline Critical Devices

S:V100

Control Device : F:NEUCDC

Areas Protected : G2, N01, NM2, NM3, & NM4

Test Procedure

1. Call up digital status for F:NEUCDC.

2. Turn on S:V100 via a parameter page.

3. Verify the digital status for F:NEUCDC indicates the S:V100 power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for F:NEUCDC indicates the S:V100 power supply is off.

6. Document the results in the MCR Logbook.