TOGGLE MENU

Beamline Critical Devices

D:V003

Control Device : D:MC1CDC

Areas Protected : Muon Campus MC1

Test Procedure

1. Call up digital status for D:MC1CDC.

2. Turn on D:V003 via a parameter page.

3. Verify the digital status for D:MC1CDC indicates the power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for D:MC1CDC indicates the power supply is off.

6. Document the results in the MCR Logbook.