TOGGLE MENU

Beamline Critical Devices

E:UH101

Control Device : L:MUCDC

Areas Protected : Muon Test Area (MTA)

Test Procedure

1. Call up digital status for L:MUCDC.

2. Turn on E:UH101 via a parameter page.

3. Verify the digital status for L:MUCDC indicates the power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for L:MUCDC indicates the power supply is off.

6. Document the results in the MCR Logbook.