TOGGLE MENU

Beamline Critical Devices

E:UBS109

Control Device : L:MUCDC

Areas Protected : Muon Test Area (MTA)

Test Procedure

1. Call up digital status for L:MUCDC.

2. Open E:UBS109 via the critical device controller status page.

3. Verify the digital status for E:UBS109 indicates the beam stop is open.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for E:UBS109 indicates the beam stop closed.

6. Document the results in the MCR Logbook.