TOGGLE MENU

Beamline Critical Devices

R:LAM52

Control Device : I:P1CRD

Areas Protected : TeV F-Sector, Muon Campus Pre-Target

Test Procedure

1. Call up digital status for I:P1CRD.

2. Turn on R:LAM52 via a parameter page.

3. Verify the digital status for I:P1CRD indicates the power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for I:P1CRD indicates the power supply is off.

6. Document the results in the MCR Logbook.