TOGGLE MENU

Beamline Critical Devices

E:HV101A & B

Control Device : E:NUMCRD

Areas Protected : MI-65, NuMI Decay Pipe Passage Way, MINOS Muon Alcoves

Test Procedure

1. Call up digital status for E:NUMCRD.

2. Turn on E:HV101A & B via a parameter page.

3. Verify the digital status for E:HV101A & B indicates the power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for E:HV101A & B indicates the power supply is off.

6. Document the results in the MCR Logbook.