TOGGLE MENU

Beamline Critical Devices

D:H910

Control Device : D:M4CDC

Areas Protected : Muon Campus M4 Enclosure

Test Procedure

1. Call up digital status for D:M4CDC.

2. Turn on D:H910 via a parameter page.

3. Verify the digital status for D:M4CDC indicates the power supply is ready and on.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for D:M4CDC indicates the power supply is off.

6. Document the results in the MCR Logbook.