TOGGLE MENU

Beamline Critical Devices

D:BV605A or D:BV605B

Control Device : D:DEL_CB

Areas Protected : Muon Campus Transport, Delivery Ring, Extraction

Test Procedure

1. Call up digital status for D:DEL_CB.

2. Open the beam stop by issuing an on command via the digital status page to the critical device controller.

3. Verify the digital status for D:DEL_CB indicates the beam stop is open.

4. Issue an off command from the digital status page to the critical device controller.

5. Verify the digital status for D:DEL_CB indicates the beam stop is closed.

6. Document the results in the MCR Logbook.