Bi-Annual (Every 6 Months) Routine Monitoring Program

As of 4/21/08

 

 

Initials

Date

Location

 

 

Signs, Postings

 

 

Outdoor Storage Areas and Ropes/Signs

 

 

[Neutrino, Proton Access Points /Svc Bldgs:  PPC, instrumentation, area checks] Checklists

 

 

G2 Service Building

 

 

 

All surveys were completed as follows (if different, it will be indicated on the specific survey pages):

 

 

 

Surveyor:

 

Instrument/Serial Number:

 

 

Batt/Source Check (Sat):

 

 

Calibration Due Date:

 

 

 

 

 

 

 

Reviewed by:

 

 

Signature/Date