Bi-Annual (Every 6 Months) Routine Monitoring Program
As of 4/21/08
Initials |
Date |
Location |
|
|
Signs,
Postings |
|
|
Outdoor
Storage Areas and Ropes/Signs |
|
|
[Neutrino,
Proton Access Points /Svc Bldgs: PPC,
instrumentation, area checks] Checklists |
|
|
G2
Service Building |
All surveys were completed as follows (if different, it will be indicated on the specific survey pages):
Surveyor: |
|
|
Instrument/Serial Number: |
|
|
Batt/Source Check (Sat): |
|
|
Calibration Due Date: |
|
|
Reviewed by: |
|
|
Signature/Date |