TOGGLE MENU

Beamline Critical Devices

L:C32Deg

Control Device : NTF CDC

Areas Protected : NTF Treatment Room

Test Procedure

1. Make-up the inputs for the NTF CDC in the NTF Control Room.

2. Turn on L:C32Deg.

3. Verify the NTF CDC status for CD2 indicates the power supply is ready and on.

4. Open the Poly Door to the NTF Treatment Room.

5. Verify the NTF CDC status for CD2 indicates the power supply is off.

6. Document the results in the MCR Logbook.